Kampala, Uganda — The Ministry of Works and Transport has issued a 30-day eviction notice to car bond operators encroaching on the road reserve along the Nakawa–Banda–Kireka section of the Kampala–Jinja Highway. The move, announced in a public notice, is aimed at restoring order, improving road safety, and preserving vital transport infrastructure.
The ministry cited Section 16(1) of the Roads Act, 2019, stating that the unauthorized establishment of car bonds on road reserves not only violates the law but also contributes to increasing traffic congestion, blocked drainage systems, and heightened safety risks for road users.

“The establishment of car bonds within the designated road reserve contravenes Section 16(1) of the Roads Act, 2019,” the ministry said in a statement. “These encroachments have significantly contributed to traffic congestion, blocked drainage channels, and pose serious safety hazards to both motorists and pedestrians.”
Under Section 24(1) of the same law, the government has granted car dealers and bond operators a grace period of 30 days, effective June 27, 2025, to voluntarily vacate the area.
“In accordance with Section 24(1) of the Roads Act, 2019, the Ministry is issuing a 30-day grace period to all affected car dealers and car bond operators,” the statement continued. “We urge all encroachers to comply and vacate the road reserve by the deadline.”
Officials further warned that failure to comply within the stipulated timeframe would lead to forceful eviction. The cost of removing any unauthorized structures or installations will be borne by the owners.
“Failure to comply within the stipulated period will result in eviction and removal of any unauthorized structures at the owner’s cost,” the notice read.

The ministry emphasized the broader intent behind the enforcement.
“This is not just about clearing space, “It’s about ensuring road safety, restoring public walkways, and preserving the functionality of one of Uganda’s most critical transport corridors.”
The Kampala–Jinja Highway is a vital artery for both domestic commuters and cross-border trade, linking Uganda to key regional markets. The latest directive follows a September 2024 announcement in which the government revealed plans to clear the Nakawa–Banda corridor of illegal car dealerships to make way for safer pedestrian paths and a long-promised cycling lane.
“We must prioritize infrastructure that supports the city’s growing mobility needs,” the official added. “This cleanup is long overdue.”






























